Monday, December 05, 2005

SRVI1 Maintenance Trip Report

Executive summary for Maintenance Trip, Nov 28 - Dec 2, 2005
  • Equipment Replacement-
  • Broken off lightning brush replaced.
  • Wind Birds (Anemometers) and magnetic compasses replaced.
  • CT (Conductivity-Temperature) groundtruth instrument replaced.
  • CTD (Cond/Temp/Depth) instrument replaced.
  • Surface Irradiometer (BIC) replaced.
  • Underwater Irradiometer (BIC) replaced.
  • Satellite Transmitter replaced.
  • Cables for all replaced instruments also replaced.
Visited potential site for ICON deployment on west end of island.
Discussed performing SRVI1 structure upgrade at Columbus Cove/Salt River
marina with marina.

--
Louis Florit, Research Associate
University of Miami/CIMAS
NOAA/Atlantic Oceanographic Meteorological Laboratory
4301 Rickenbacker Causeway
Miami, FL 33149
Phone: (305) 361-4445